Engineering
The Division of Engineering oversees the design and construction of capital infrastructure projects, ensures new development is compliant with the community’s standards, and manages permitting within the public right-of-way.
Division of Engineering
101 E. Vine St.
4th Floor
Lexington, KY 40507
Visit Lexington's One-Stop Shop portal for help with permitting.
Manuals for New Development and Design and Construction can be found on their pages.
Paint markings on the street could be local utility companies marking their service lines. Below are the standard paint colors used by each utility.
News
Two-lane travel on Clays Mill Road is expected to resume Saturday.
The lane closure is expected to start on Thursday, November 4 and continue through Thursday, November 18.
Crews will begin milling and repaving work on Versailles Road between Parkers Mill and Oxford Circle (west intersection) starting at 6 p.m. on Sunday, September 12. The work, which will take place between 6 p.m. and 6 a.m., is expected to take six nights.