Engineering

The Division of Engineering oversees the design and construction of capital infrastructure projects, ensures new development is compliant with the community’s standards, and manages permitting within the public right-of-way.

Division of Engineering
101 E. Vine St.
4th Floor
Lexington, KY  40507

Visit Lexington's One-Stop Shop portal for help with permitting.

Manuals for New Development and Design and Construction can be found on their pages.

Paint markings on the street could be local utility companies marking their service lines.  Below are the standard paint colors used by each utility.

Call before you dig

News

Surveying begins for New Circle Road safety project

This week, surveying will begin for a project to improve safety along a busy Lexington Corridor.

Part of Delong Road to be one lane for construction

Part of Delong Road will be limited to one lane of traffic from Monday, Sept. 16 to Friday, Oct. 4. Between Jasmine Rose Way and Chas Drive, the road will alternate one way at a time.

Manchester Street to be closed at High Street for construction

A short section of Manchester Street, formerly South Jefferson Street, will be temporarily closed to traffic starting on Tuesday, May 28 for construction related to Town Branch Park. This closure is expected to last until early fall.

Contact